Sandbox Facilities
Sandbox sample Selected supply chains only. All figures and scenarios describe this sample, not the whole market.Example investigations
NdPr oxide

Eneabba Rare Earths Refinery

Under construction; up to 5.5 kt/y NdPr oxide depending on feedstock.

Follow with a subscription
ConstructionFacility status
0Documented connections
0Operating supply routes
2Source documents

Production and control

Annual scenario baseline
5.5 kt NdPr oxide/yr
Measurement basis
Projected Design
Current utilisation
Not disclosed
Operator
Iluka Resources
Jurisdiction
Australia
Products
NdPr oxide
Location evidence
-29.8200, 115.2700
Reviewed
15 Sept 2026

Future production remains dependent on financing, construction, commissioning and qualification.

Supply relationships

Current supply, signed contracts and proposed routes are kept separate.

No sourced site-to-site relationship is established.

Production history and commercial commitments

Inspect disclosures at their original scope. A company total is not assigned to its individual facilities.

0 observations. Group totals stay at group scope. Annual and quarterly periods overlap; these rows are not additive.

No matching production disclosure. Try another scope or inspect the commercial book. An undisclosed quantity is not zero production.