NdPr oxide
Eneabba Rare Earths Refinery
Under construction; up to 5.5 kt/y NdPr oxide depending on feedstock.
ConstructionFacility status
0Documented connections
0Operating supply routes
2Source documents
Production and control
- Annual scenario baseline
- 5.5 kt NdPr oxide/yr
- Measurement basis
- Projected Design
- Current utilisation
- Not disclosed
- Operator
- Iluka Resources
- Jurisdiction
- Australia
- Products
- NdPr oxide
- Location evidence
- -29.8200, 115.2700
- Reviewed
- 15 Sept 2026
Future production remains dependent on financing, construction, commissioning and qualification.
Supply relationships
Current supply, signed contracts and proposed routes are kept separate.
No sourced site-to-site relationship is established.
Production history and commercial commitments
Inspect disclosures at their original scope. A company total is not assigned to its individual facilities.
0 observations. Group totals stay at group scope. Annual and quarterly periods overlap; these rows are not additive.
No matching production disclosure. Try another scope or inspect the commercial book. An undisclosed quantity is not zero production.